Or "How we self-sabotage our starting positions for the next conflict, through unacceptable QC and wasteful Defense Spending"

A $2.7 billion attack submarine, the USS Minnesota, has been out of commission for more than a year because of a defective pipe joint near the ship’s nuclear-powered engine.

The defective part, which is worth about $10,000, was installed near the ship’s nuclear power plant. Engineers discovered the poorly welded steam pipe in early 2015, and ongoing repairs have led to the ship being stuck in overhaul ever since, according to Navy Times.
http://www.msn.com/en-us/news/us/how...oNm?li=BBnbfcL