Originally Posted by
sandbag
I know of a contractor performing work ordered within scope by the KO to pour sidewalks at a FOB. The sidewalk-making was going well and within cost, schedule and performance parameters. Then a senior soldier (we'll keep the rank out of this on principle) decided he needed a sidewalk to his quarters, along with one for his boss. He directed the contractor to perform this. The contractor's on-site supervisor, not having a full command of the language, and doing what DCUs tell him to, begins pouring the extra sidewalks.
Needless to say, confusion, frustration and anger reigned with both the KO and the contractor when the project busted the parameters. Evil, greedy contractor? Not hardly. Government conspiracy? Nope. Apparent authority mis-utilized? Yep.