So the SBCTs are concepted as little more than protected and reinforced constabulary troops, but since they are here, they are or will be used in roles that are basically beyond their concept and capabilites. I see them always in danger of being employed in the wrong spot of the sequence of Armor - Cavalry - MechInf - MotInf. Basically for tasks like Irak cavalry would be right for the "heavy" part. Problem is they are equipped with 35 metric tons M2/M3. Should have bought the CV90 - are the same weight as Strykers and look much more real to me (I have no experience in either of those vehicles). Of course, if "wheeled" is the buzzword ...


But something else: Given the fact that the whole IBCT thing is just a placeholder for FCS, and the idea is having a protected/armored air portable system, maybe the answer does not lie in keeping things within C-130J limits, but in a new transport plane, like e.g. licence produce the Airbus A400M.

Now that the FCS looks more like 30 tons (and I think it will go to 35) the Hercules is out of the picture anyway (for the lower part of the C-130 mission the C-27J is the right thing). Or if somebody doesn't like Eurostuff, proceede with that Northrop ESTOL Stelath-BWB (Future Tactical Airlifter or something) concept.

And to turn one of the arguments here on its head - when not willing to use an APC stemming from the 1950's, why base whole formations like IBCT or FCS-UAs on the transport capabilities of the 1950's (C-130)? I think what we see here is the lack of coordination from the leadership, to force the USAF to create/buy the right sized tactical airlifter for Army requirements.